Case Study: Infrastructure Revitalization for Hospitality Sector

     Mark Bridges    |    PRINCE2


Fortune 500 companies typically bring on global consulting firms, like McKinsey, BCG, Bain, Deloitte, and Accenture, or boutique consulting firms specializing in PRINCE2 to thoroughly analyze their unique business challenges and competitive situations. These firms provide strategic recommendations based on consulting frameworks, subject matter expertise, benchmark data, KPIs, templates, and other tools developed from past client work. We followed this management consulting approach for this case study.

TLDR The organization in the hospitality industry faced challenges in managing its property portfolio effectively due to misalignment with PRINCE2 principles, resulting in project overruns and decreased stakeholder satisfaction. By implementing PRINCE2 methodologies, the organization achieved a 25% reduction in project overruns and a 30% increase in stakeholder satisfaction, highlighting the importance of structured project management for operational success.

Reading time: 9 minutes

Consider this scenario: The organization in question operates within the hospitality industry and has been struggling to manage its extensive portfolio of properties efficiently.

Despite a robust market position, the organization faces challenges in aligning its project management practices with PRINCE2 principles. The disconnect has led to schedule overruns, cost escalations, and a decline in stakeholder satisfaction. The organization is seeking to refine its project management approach to enhance efficiency, control, and governance.



Initial observations suggest that the organization's difficulties may stem from inadequate stakeholder engagement and poor risk management. Another hypothesis is that the existing project governance framework lacks the rigor and structure required by PRINCE2, leading to inconsistent project outcomes. A third possibility is that project teams are not sufficiently equipped with PRINCE2 methodologies, resulting in misalignment with organizational strategic objectives.

Strategic Analysis and Execution

Adopting a structured PRINCE2 methodology will provide the organization with a governance model that enhances project alignment with business objectives, ensuring that each project delivers value. This methodology is widely recognized for its ability to impart clarity, control, and efficiency in project management.

  1. Initial Assessment and Tailoring: Review the organization’s current project management practices and tailor the PRINCE2 framework to fit the unique context of the hospitality industry. Key questions include: How well are current projects aligned with strategic goals? What are the existing governance structures?
  2. Planning and Design: Develop detailed project plans aligned with PRINCE2 principles, focusing on product-based planning and stage control. Activities include defining project stages, key deliverables, and quality requirements. Potential insights may reveal gaps in planning processes or resource allocation.
  3. Implementation and Monitoring: Guide the organization through the PRINCE2 process model, ensuring each project stage is executed with high discipline. Key analyses will involve monitoring project progress against baselines and managing deviations.
  4. Stakeholder Engagement and Communication: Establish a systematic approach to stakeholder management, ensuring clear and consistent communication and engagement throughout project lifecycles. Challenges often arise in stakeholder alignment and buy-in.
  5. Review and Continuous Improvement: Embed a culture of learning by reviewing project outcomes, capturing lessons learned, and refining the PRINCE2 methodology based on practical insights. Deliverables include post-project evaluation reports and improvement plans.

For effective implementation, take a look at these PRINCE2 frameworks, toolkits, & templates:

PRINCE2 Project Management Overview (64-slide PowerPoint deck)
One-Page PRINCE2 Foundation (1-page PDF document)
Foundation Training Material for PRINCE2 (6th Edition) (219-slide PowerPoint deck)
PRINCE2 Templates + Microsoft Project MPP MSP & MS Excel (Excel workbook)
PRINCE2 Editable Excel Planning & Cost Tracker Spreadsheet (Excel workbook)
View additional PRINCE2 documents

Are you familiar with Flevy? We are you shortcut to immediate value.
Flevy provides professional business documents—the same as those produced by top-tier consulting firms and used by Fortune 100 companies. Our business frameworks, templates, and toolkits are of the same caliber as those produced by top-tier management consulting firms, like McKinsey, BCG, Bain, Deloitte, and Accenture. Most were developed by seasoned executives and consultants with 20+ years of experience.

Trusted by over 10,000+ Client Organizations
Since 2012, we have provided business templates to over 10,000 businesses and organizations of all sizes, from startups and small businesses to the Fortune 100, in over 130 countries.
AT&T GE Cisco Intel IBM Coke Dell Toyota HP Nike Samsung Microsoft Astrazeneca JP Morgan KPMG Walgreens Walmart 3M Kaiser Oracle SAP Google E&Y Volvo Bosch Merck Fedex Shell Amgen Eli Lilly Roche AIG Abbott Amazon PwC T-Mobile Broadcom Bayer Pearson Titleist ConEd Pfizer NTT Data Schwab

Implementation Challenges & Considerations

Understanding that the leadership team may have concerns regarding the integration of PRINCE2, it is essential to communicate the value of a structured project management approach in driving project success and strategic alignment. The benefits of PRINCE2 include improved risk management, stakeholder satisfaction, and resource optimization.

Upon full implementation, the organization can expect to see a reduction in project overruns, cost savings through efficient resource utilization, and a higher rate of project success. These outcomes should be quantifiable, with a potential reduction in overruns by up to 20%-30%, as reported in industry benchmarks.

Challenges may include resistance to change, the complexity of adapting current practices to a new framework, and the need for comprehensive training. Overcoming these challenges is critical for successful PRINCE2 integration.

Implementation KPIs

KPIS are crucial throughout the implementation process. They provide quantifiable checkpoints to validate the alignment of operational activities with our strategic goals, ensuring that execution is not just activity-driven, but results-oriented. Further, these KPIs act as early indicators of progress or deviation, enabling agile decision-making and course correction if needed.


Measurement is the first step that leads to control and eventually to improvement.
     – H. James Harrington

  • Project Completion Rate: Measures the percentage of projects completed on time, indicating efficiency in project execution.
  • Budget Variance: Assesses financial performance against the project budget, reflecting cost management capability.
  • Stakeholder Satisfaction Index: Gauges the satisfaction levels of project stakeholders, a critical success factor for PRINCE2 projects.
  • Risk Mitigation Effectiveness: Evaluates the success of risk management strategies in minimizing project uncertainties.

For more KPIs, you can explore the KPI Depot, one of the most comprehensive databases of KPIs available. Having a centralized library of KPIs saves you significant time and effort in researching and developing metrics, allowing you to focus more on analysis, implementation of strategies, and other more value-added activities.

Learn more about KPI Depot KPI Management Performance Management Balanced Scorecard

Key Takeaways

Incorporating PRINCE2 into the organization’s project management practices offers a pathway to Operational Excellence. It is imperative for the leadership team to champion the adoption of PRINCE2, ensuring that every project aligns with the overarching Strategy Development goals. Firms that have effectively integrated PRINCE2 report an increase in project success rates and a more robust governance model.

Deliverables

  • PRINCE2 Alignment Strategy (PowerPoint)
  • Project Governance Framework (Word)
  • Resource Optimization Plan (Excel)
  • Stakeholder Engagement Template (PowerPoint)
  • Continuous Improvement Report (Word)

Explore more PRINCE2 deliverables

PRINCE2 Templates

To improve the effectiveness of implementation, we can leverage the PRINCE2 templates below that were developed by management consulting firms and PRINCE2 subject matter experts.

Enhancing Stakeholder Engagement

One of the critical factors in the success of PRINCE2 implementation is the level of stakeholder engagement. In the hospitality sector, where guest experience and service quality are paramount, involving stakeholders at every stage of the project is crucial. A comprehensive stakeholder engagement strategy is necessary to ensure that their needs and expectations are consistently met and managed throughout the project lifecycle.

To enhance stakeholder engagement, the organization must first identify all stakeholders, including guests, staff, suppliers, and investors. It should then map their influence and interest regarding the project's outcomes. Effective communication plans tailored to each stakeholder group are essential to foster transparency and trust. It's also important to establish feedback mechanisms that allow stakeholders to voice concerns and provide input that can be incorporated into project planning and execution.

Regular updates and meetings should be scheduled to keep stakeholders informed about project progress and to address any issues promptly. By actively engaging stakeholders and incorporating their feedback, the organization can improve the relevance and quality of project deliverables, leading to increased satisfaction and better project outcomes.

Aligning PRINCE2 with Organizational Culture

Introducing a new framework like PRINCE2 into an organization's existing culture can be challenging. The key to successful adoption lies in understanding the organization's culture and aligning the PRINCE2 principles accordingly. To do this, the organization should assess its cultural readiness for change, including the current levels of project management maturity and the willingness of team members to adopt new methodologies.

It's crucial to have the buy-in of executive leadership to drive the change from the top down. Leadership should demonstrate commitment by participating in training sessions and clearly communicating the benefits of PRINCE2 to the organization. Furthermore, creating a network of PRINCE2 champions within the organization can facilitate peer-to-peer learning and support.

Change management initiatives should be put in place to address resistance and to help staff understand the value PRINCE2 brings to their roles. Training and professional development opportunities should be provided to ensure that team members have the necessary skills to implement the methodology effectively. By aligning PRINCE2 with the organization's culture, the hospitality firm can ensure a smoother transition and greater acceptance of the new project management practices.

Optimizing Resource Allocation

Resource allocation is a critical aspect of project management that directly impacts a project's success. In the hospitality industry, where resources range from physical assets to human capital, effective allocation is essential to maintain service quality while executing projects. The PRINCE2 methodology emphasizes the importance of planning and defining resource requirements early in the project lifecycle.

To optimize resource allocation, the organization should establish a clear understanding of resource availability and constraints. This involves inventorying the current assets, assessing the skills and availability of staff, and determining the financial resources that can be allocated to projects. A resource optimization plan should be developed to match the right resources with the right projects at the right time.

PRINCE2's focus on stage planning allows for a more dynamic approach to resource management, as resources can be reallocated as priorities shift throughout the project. This is particularly important in the hospitality industry, where customer demands and market conditions can change rapidly. By adopting PRINCE2, the organization can expect to achieve more efficient use of resources, reducing waste and improving project outcomes.

Training and Development for PRINCE2 Adoption

For the successful adoption of PRINCE2, it is critical to ensure that project teams are adequately trained and equipped with the necessary skills. This requires a structured approach to training and development that is tailored to the organization's specific needs and the individual competencies of team members.

The organization should conduct a skills gap analysis to determine the current level of project management expertise and identify areas where training is required. Based on this analysis, a comprehensive training program should be developed, which may include formal PRINCE2 certification courses, workshops, and on-the-job training. It's also beneficial to provide training that is specific to the hospitality industry, focusing on scenarios and case studies that are directly applicable to the organization's projects.

Continuous professional development should be encouraged, with opportunities for team members to update their skills as the organization's project management maturity evolves. By investing in training and development, the organization can build a knowledgeable and competent project management team that is capable of delivering projects successfully using the PRINCE2 methodology.

Measuring Project Success

Measuring project success in the context of PRINCE2 adoption is multifaceted, involving not only the traditional metrics of time, cost, and quality but also the degree to which projects align with strategic objectives and deliver value to stakeholders. The organization should establish clear criteria for success at the outset of each project, which may include specific performance targets, deliverable quality standards, and stakeholder satisfaction levels.

Success metrics should be continuously monitored throughout the project lifecycle to enable timely interventions if performance deviates from expectations. This requires robust project control systems and regular reporting to provide visibility into project performance. It's also important to conduct post-project reviews to capture lessons learned and to assess the overall success of the project in delivering strategic value.

By measuring project success in a comprehensive manner, the organization can not only ensure that individual projects are delivered effectively but also that the adoption of PRINCE2 contributes to the overall improvement of project management practices and business outcomes in the hospitality sector.

PRINCE2 Case Studies

Here are additional case studies related to PRINCE2.

Retail Inventory Optimization Case Study: Fast Fashion Chain Using PRINCE2

Scenario:

The fast fashion retail chain faced challenges in inventory management of a fast fashion retail network, struggling to balance agility with PRINCE2 project management principles.

Read Full Case Study

PRINCE2 Project Methodology Implementation in an International Conglomerate

Scenario: A multinational organization, struggling with a fragmented project management framework, seeks to standardize operations by implementing PRINCE2 across its various divisions.

Read Full Case Study

Telecom Infrastructure Expansion in Digital Transformation Era

Scenario: The organization, a telecom service provider, is grappling with the challenges of scaling up its infrastructure to meet the burgeoning demand for digital connectivity.

Read Full Case Study

Telecom Network Expansion in the Maritime Industry

Scenario: The organization is a prominent telecommunications provider specializing in maritime communications solutions.

Read Full Case Study


Explore additional related case studies

Additional Resources Relevant to PRINCE2

Here are additional frameworks, presentations, and templates relevant to PRINCE2 from the Flevy Marketplace.

Did you know?
The average daily rate of a McKinsey consultant is $6,625 (not including expenses). The average price of a Flevy document is $65.

Key Findings and Results

Here is a summary of the key results of this case study:

  • Reduced project overruns by 25% through the implementation of PRINCE2 methodologies, aligning with industry benchmarks.
  • Increased stakeholder satisfaction by 30% by establishing a systematic stakeholder engagement and communication strategy.
  • Achieved a 20% improvement in resource utilization across projects, leading to cost savings and efficiency gains.
  • Enhanced project success rate from 60% to 85% by adopting PRINCE2's structured approach to project management.
  • Implemented a continuous improvement process that identified and addressed key areas for enhancement in project delivery.

The initiative to adopt PRINCE2 methodologies within the organization's project management practices has been markedly successful. The significant reduction in project overruns and the improvement in stakeholder satisfaction are clear indicators of the initiative's effectiveness. The alignment of projects with strategic objectives, as evidenced by the enhanced project success rate, demonstrates the value of a structured project management approach. The challenges of resistance to change and the complexity of integrating new practices were effectively managed through comprehensive training and stakeholder engagement. However, further improvements could potentially be achieved by deeper integration of PRINCE2 principles in day-to-day operations and by fostering an even stronger culture of continuous improvement.

For the next steps, it is recommended to focus on further embedding the PRINCE2 framework into the organizational culture to ensure its principles become second nature to the project teams. This could involve more advanced training, the establishment of a mentorship program with PRINCE2 experts, and the integration of PRINCE2 terminology and practices into everyday project discussions and documentation. Additionally, expanding the continuous improvement process to include more quantitative measures of project success and stakeholder feedback could provide more targeted insights for future enhancements. Finally, exploring the use of technology to automate and streamline PRINCE2 processes could further increase efficiency and project outcomes.


 
Mark Bridges, Chicago

Strategy & Operations, Management Consulting

The development of this case study was overseen by Mark Bridges. Mark is a Senior Director of Strategy at Flevy. Prior to Flevy, Mark worked as an Associate at McKinsey & Co. and holds an MBA from the Booth School of Business at the University of Chicago.

This case study is licensed under CC BY 4.0. You're free to share and adapt with attribution. To cite this article, please use:

Source: Telecom Network Expansion in the Maritime Industry, Flevy Management Insights, Mark Bridges, 2026


Flevy is the world's largest marketplace of business templates & consulting frameworks.


Leverage the Experience of Experts.

Find documents of the same caliber as those used by top-tier consulting firms, like McKinsey, BCG, Bain, Deloitte, Accenture.

Download Immediately and Use.

Our PowerPoint presentations, Excel workbooks, and Word documents are completely customizable, including rebrandable.

Save Time, Effort, and Money.

Save yourself and your employees countless hours. Use that time to work on more value-added and fulfilling activities.

People illustrations by Storyset.




Read Customer Testimonials

 
"I like your product. I'm frequently designing PowerPoint presentations for my company and your product has given me so many great ideas on the use of charts, layouts, tools, and frameworks. I really think the templates are a valuable asset to the job."

– Roberto Fuentes Martinez, Senior Executive Director at Technology Transformation Advisory
 
"If you are looking for great resources to save time with your business presentations, Flevy is truly a value-added resource. Flevy has done all the work for you and we will continue to utilize Flevy as a source to extract up-to-date information and data for our virtual and onsite presentations!"

– Debbi Saffo, President at The NiKhar Group
 
"I have found Flevy to be an amazing resource and library of useful presentations for lean sigma, change management and so many other topics. This has reduced the time I need to spend on preparing for my performance consultation. The library is easily accessible and updates are regularly provided. A wealth of great information."

– Cynthia Howard RN, PhD, Executive Coach at Ei Leadership
 
"Flevy is our 'go to' resource for management material, at an affordable cost. The Flevy library is comprehensive and the content deep, and typically provides a great foundation for us to further develop and tailor our own service offer."

– Chris McCann, Founder at Resilient.World
 
"My FlevyPro subscription provides me with the most popular frameworks and decks in demand in today’s market. They not only augment my existing consulting and coaching offerings and delivery, but also keep me abreast of the latest trends, inspire new products and service offerings for my practice, and educate me "

– Bill Branson, Founder at Strategic Business Architects
 
"FlevyPro provides business frameworks from many of the global giants in management consulting that allow you to provide best in class solutions for your clients."

– David Harris, Managing Director at Futures Strategy
 
"Flevy is now a part of my business routine. I visit Flevy at least 3 times each month.

Flevy has become my preferred learning source, because what it provides is practical, current, and useful in this era where the business world is being rewritten.

In today's environment where there are so "

– Omar Hernán Montes Parra, CEO at Quantum SFE
 
"I have used Flevy services for a number of years and have never, ever been disappointed. As a matter of fact, David and his team continue, time after time, to impress me with their willingness to assist and in the real sense of the word. I have concluded in fact "

– Roberto Pelliccia, Senior Executive in International Hospitality




Additional Flevy Management Insights

Financial Ratio Analysis Benchmarks Case Study: Telecom Sector

Scenario:

A telecom service provider operating in the highly competitive North American market faces margin pressures and investor scrutiny despite consistent revenue growth.

Read Full Case Study

PESTEL Analysis for Luxury Brand Expansion in Emerging Asian Markets

Scenario: A high end luxury goods manufacturer is pursuing expansion in Asia, attracted by a fast growing affluent consumer base but constrained by meaningful market entry complexity.

Read Full Case Study

ISO 45001 Implementation Plan and Project Roadmap for a Pharmaceutical Manufacturer

Scenario: A leading pharmaceutical manufacturer is struggling with workplace injuries and inconsistent compliance with occupational health and safety regulations, driving up costs through fines, insurance premiums, and operational disruption.

Read Full Case Study

Master Data Management Case Study: Luxury Retail Transformation

Scenario:

The luxury retail organization faced challenges with siloed and inconsistent data across its global brand portfolio.

Read Full Case Study

Luxury Cosmetics Pricing Strategy Case Study: Improving Margins While Protecting Brand Image

Scenario: A luxury cosmetics brand operating in a highly competitive, price-sensitive market is seeing margin pressure from rising input costs, intensifying promotional behavior, and frequent competitor price moves.

Read Full Case Study

Total Quality Management Case Study: Regional Hospital Healthcare Industry

Scenario:

A regional hospital in the healthcare industry faced a 12% increase in patient wait times and a 9% decrease in patient satisfaction scores.

Read Full Case Study

Core Competencies Analysis Case Study: Rapidly Growing Tech Company

Scenario:

A rapidly growing technology company is struggling to maintain its competitive position due to unclear core competencies.

Read Full Case Study

Mergers & Acquisitions Strategy for Semiconductor Firm in High-Tech Sector

Scenario: A firm in the semiconductor industry is grappling with the challenges posed by rapid consolidation and technological evolution in the market.

Read Full Case Study

Zachman Framework Case Study: Enterprise Architecture Implementation for a Global Financial Institution

Scenario: A global financial institution is undertaking a major enterprise-wide technology modernization and needs a structured way to standardize how it defines, governs, and communicates its enterprise architecture across business and IT.

Read Full Case Study

Consumer Electronics Sales Management Case Study: Boosting Sales & Market Share

Scenario: A mid-size consumer electronics manufacturer in a highly competitive market faced declining consumer electronics industry sales and market share due to Sales Management gaps and intensifying competition from new entrants.

Read Full Case Study

Porter’s Five Forces Analysis of the Hotel & Hospitality Industry (Boutique Hotel Chain)

Scenario: A boutique hotel chain operating in a saturated urban hospitality market is seeing margin compression driven by intense competition, rising distribution costs, and shifting guest behavior toward digital-first booking and alternative lodging options.

Read Full Case Study

PDCA Cycle Refinement for Boutique Hospitality Firm

Scenario: The boutique hotel chain in the competitive North American luxury market is experiencing inconsistencies in service delivery and guest satisfaction.