Before staffing or budgeting a change management workstream on an SAP
implementation, the first question every PMO and consultant has to answer is: how
much organizational change management effort does this project actually need?
Guessing, or applying the same OCM budget to every project regardless of its
actual risk profile, is one of the most common and costly mistakes in SAP change
management.
This Excel-based assessment answers that question directly, and addresses the
related questions that come with it: Is this project complex enough to need a
dedicated change manager? How much resistance should we expect from stakeholders?
Is the strategic visibility of this project high enough to require senior
sponsorship? Should we prioritize internal resources or bring in external change
management support?
What's included in this Excel tool kit workbook:
• Read Me tab explaining the scoring methodology and sourcing
• Assessment tab: 16 scoring items across 4 sections (Complexity of the SAP
Implementation, Expected Change Impacts, Stakeholder Landscape, Strategic
Relevance), each rated 1-7
• Guidance Library tab: the full set of interpretation and action guidance
referenced by the results
• Results & Guidance tab: automatic classification of each section as Low,
Medium, or High, section-specific recommended actions at every level (not just
High), a combined overall score and resourcing recommendation, and a priority
summary that surfaces the highest-risk areas at a glance
The four sections, sixteen items, and core High-level guidance all come directly from
SAP's published OCM framework; the Low and Medium guidance extends that framework
using practitioner judgment, and each of these are clearly labeled as such. To use it, score each item
honestly on the Assessment tab and read the automatically generated guidance on
the Results tab, no manual calculation required.
Delivered as a fully editable Excel spreadsheet (XLSX) with dropdown-based
scoring. An SAP change management scorecard and readiness assessment template
suited to anyone scoping an OCM workstream before resourcing decisions are made.
Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.
Source: Best Practices in Change Management, Project Management Excel: SAP OCM Project Assessment Excel (XLSX) Spreadsheet, SAP Planning Pro
|
Download our FREE Organization, Change, & Culture, Templates
Download our free compilation of 50+ slides and templates on Organizational Design, Change Management, and Corporate Culture. Methodologies include ADKAR, Burke-Litwin Change Model, McKinsey 7-S, Competing Values Framework, etc. |