Want FREE Templates on Strategy & Transformation? Download our FREE compilation of 50+ slides. This is an exclusive promotion being run on LinkedIn.

Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation   208-slide PPT PowerPoint presentation (PPT)
$79.00

Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (208-slide PPT PowerPoint presentation (PPT)) Preview Image Log in to unlock full preview.
Arrow   Unlock all 71 preview images:   Login Register

Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation (PowerPoint PPT)

File Type: 208-slide PPT PowerPoint presentation (PPT)
Secondary File: Zip archive file (ZIP)

Top 1,000 Best Practice $79.00
This presentation is developed by a pioneer in Lean and certified LSS Master Black Belt who has trained over 5,000+ students globally, from Directors, CEOs, GMs, to shop floor staff. He's endorsed by CMI Consortium, NZTE, HERA, NZPICS, CBAFF.
Add to Cart
  


BUY WITH CONFIDENCE

Immediate digital download upon purchase.
Lifetime document updates included with purchase.
Fully editable & customizable PPT document.
Supplemental ZIP document also included.
Trusted by over 10,000+ organizations.

BENEFITS OF DOCUMENT

  1. Improve reliability of plant & equipment
  2. Measure the machine performance losses and understand better
  3. Introduce autonomous maintenance

DESCRIPTION

This product (Reliability Centered Maintenance [RCM] and Total Productive Maintenance [TPM] - 2 Day Presentation) is a 208-slide PPT PowerPoint presentation (PPT) with a supplemental Zip archive file document, which you can download immediately upon purchase.

Reliability Centered Maintenance and Total Productive Maintenance presentation is intended to help as a 2-day workshop material for Operations and Maintenance personnel.
This presentation consists of over 200 slides and comprises of the following:

Group Activity – Define Maintenance Excellence
Maintenance Excellence – Activity
What is RCM?
Objective & goal of RCM
Techniques employed by RCM
Primary RCM Principles
Types of Maintenance Tasks
RCM Considerations, Applicability + Benefits
Steps in RCM Implementation
TPM vision, definition, origins, principles
8 Pillars of TPM
TPM Self-Assessment
Autonomous maintenance
Equipment & Process Improvement
Equipment Losses, Manpower & Material Losses
OEE – what it is & Calculations
Activity OEE Calculation
Other pillars of TPM
TPM Implementation – 12 steps
Benefits & OEE Tracker
Proactive Maintenance Analysis
Liaison with Ops, Communicating OEE,
Group Activity – OEE Communication/Importance
Ops. Skills, Cleanliness,
Monitoring – Gauges, Lubrication, Contamination, Vibration, One point Lesson
Activity – Maintenance / Operations
Analysis of Maintenance History, MTBF and its calculation
Activity – MTBF Calculation
Improving Equipment performance
FMEA, Types, Calculating RPN
Activity
HAZOP Hazard and Operability Analysis
Condition Monitoring Analysis / Predictive Maintenance / Condition Based Monitoring
Vibration Monitoring, Oil sampling & testing, Thermography, Types, Ultrasonics, Human Senses and Condition Monitoring Strategy
Activity -
Maintenance Excellence
Activity – Why equipment fails?
3 Contributors, Lubrication, Vibration and contamination
Proactive Maintenance – 6 big losses, OEE
Prioritization of equipment problems
Focused equipment & process Improvement
Cleaning, Inspection, Equipment tagging, CI
Maintenance Strategies – TPM or RCM? Or Other?
Activity: TPM vs RCM
Maintenance Excellence – making the difference
Activity: Using our senses
Eliminating lubrication issues, frequency, type, Mistake proofing, Standards, Visual management, Automation, daily Checks
Activity – Improving Lubrication Practices
Vibration Practices and improvement
Activity – Reducing Vibration
Contamination
Activity – Reducing Contamination
Operator Involvement – Check lists, visual controls

Also included with this document is a bonus zip of 41 Lean documents (includes templates, case studies, articles, posters, charts, and more).

Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.

Source: Best Practices in Total Productive Maintenance, RCM, Autonomous Maintenance PowerPoint Slides: Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM) - 2 Day Presentation PowerPoint (PPT) Presentation, Vishnu Rayapeddi


$79.00
This presentation is developed by a pioneer in Lean and certified LSS Master Black Belt who has trained over 5,000+ students globally, from Directors, CEOs, GMs, to shop floor staff. He's endorsed by CMI Consortium, NZTE, HERA, NZPICS, CBAFF.
Add to Cart
  

OVERVIEW

File Type: PowerPoint ppt (PPT)
Secondary File: Zip archive file zip (ZIP)
File Size: 13.4 MB
Number of Slides: 208 (includes cover and all slides)


ABOUT THE AUTHOR

Author: Vishnu Rayapeddi
Additional documents from author: 88

Vishnu is an experienced management consultant and trainer specializing in implementing continuous process improvements. [read more]

Ask the Author a Question

Must be logged in

Did you know?
The average daily rate of a McKinsey consultant is $6,625 (not including expenses). The average price of a Flevy document is $65.




Trusted by over 10,000+ Client Organizations
Since 2012, we have provided best practices to over 10,000 businesses and organizations of all sizes, from startups and small businesses to the Fortune 100, in over 130 countries.
AT&T GE Cisco Intel IBM Coke Dell Toyota HP Nike Samsung Microsoft Astrazeneca JP Morgan KPMG Walgreens Walmart 3M Kaiser Oracle SAP Google E&Y Volvo Bosch Merck Fedex Shell Amgen Eli Lilly Roche AIG Abbott Amazon PwC T-Mobile Broadcom Bayer Pearson Titleist ConEd Pfizer NTT Data Schwab




Read Customer Testimonials




Customers Also Bought These Documents


Customers Also Like These Documents

Related Management Topics


Total Productive Maintenance Operational Excellence Autonomous Maintenance Lean Management/Enterprise Strategic Planning Strategy Deployment & Execution Hoshin Kanri Valuation PowerPoint Diagrams Compilation Presentation Development Root Cause Analysis Communications Strategy Pyramid Principle Kaizen Process Improvement RCM M&A (Mergers & Acquisitions) Gemba Walk Problem Solving Overall Equipment Effectiveness Consulting Frameworks Strategy Development Cost of Quality Cost Reduction Assessment Quality Management & Assurance Gap Analysis Consulting Training Strategy Frameworks Planned Maintenance

Receive our FREE presentation on Operational Excellence

This 50-slide presentation provides a high-level introduction to the 4 Building Blocks of Operational Excellence. Achieving OpEx requires the implementation of a Business Execution System that integrates these 4 building blocks.