Lean Quick Changeover SMED   47-slide PPT PowerPoint presentation (PPTX)
$29.00

Lean Quick Changeover SMED (47-slide PPT PowerPoint presentation (PPTX)) Preview Image Lean Quick Changeover SMED (47-slide PPT PowerPoint presentation (PPTX)) Preview Image Lean Quick Changeover SMED (47-slide PPT PowerPoint presentation (PPTX)) Preview Image Lean Quick Changeover SMED (47-slide PPT PowerPoint presentation (PPTX)) Preview Image Lean Quick Changeover SMED (47-slide PPT PowerPoint presentation (PPTX)) Preview Image Lean Quick Changeover SMED (47-slide PPT PowerPoint presentation (PPTX)) Preview Image Log in to unlock full preview.
Loading preview images...
Arrow   Unlock all 16 preview images:   Login Register

Lean Quick Changeover SMED (PowerPoint PPTX)

PowerPoint (PPTX) 47 Slides

#2 in SMED $29.00

Add to Cart
  


Immediate download
Fully editable PowerPoint
Free lifetime updates

BENEFITS OF DOCUMENT

  1. Lower manufacturing costs (faster changeovers mean less equipment down time).
  2. Smaller lot sizes (faster changeovers enable more frequent product changes).
  3. Smoother startups (standardized changeover processes improve consistency and quality).

DESCRIPTION

This product (Lean Quick Changeover SMED) is a 47-slide PPT PowerPoint presentation (PPTX), which you can download immediately upon purchase.

SMED (Single-Minute Exchange of Dies) is a system for dramatically reducing the time it takes to complete equipment changeovers.

The name SMED comes from the goal of reducing changeover times to the "single" digits (i.e. less than 10 minutes).

This documents contain step by step implementation of SMED process.
Topics :-
Why SMED is important for Companies
Disadvantages of Large-Lot Production
Benefits of Shortening Changeover Time with – SMED
SMED's Conceptual Stages & Practical Techniques
SMED Conceptual Stages
Changeover Time – Data Collection Sheet
Separating Internal & External Setup
Conversion of Internal Setup to External Setup
Practical Techniques that help shift
Effects of SMED Application

The Lean Quick Changeover SMED PPT offers a comprehensive guide to optimizing your manufacturing processes by reducing equipment changeover times. It delves into the core principles of SMED, emphasizing the importance of flexibility, quicker delivery, better quality, and higher productivity. The document provides a detailed breakdown of the manufacturing process, highlighting the four basic phases: transport, processing, storage, and setup operations. It distinguishes between internal and external setups, offering practical techniques for converting internal setup tasks to external ones.

The document also includes a section on using videotape to conduct a setup analysis, showcasing before and after scenarios to illustrate the effectiveness of SMED. It outlines the three stages of SMED implementation: separating internal and external setup, converting internal setup to external setup, and streamlining all aspects of setup. Each stage is accompanied by practical examples and techniques that can be applied in real-world scenarios, making it a valuable resource for any organization looking to improve its setup operations.

In addition, the document covers the benefits of SMED for companies, such as improved machine work rates, reduced setup errors, enhanced product quality, and safer operations. It also addresses the effects of SMED application, including total management improvement, reduced total setup time, and the elimination of the need for special skills. The document concludes with a discussion on eliminating adjustments and trial runs, emphasizing the importance of accurate centering, dimensioning, and condition setting during previous setup steps to save machine downtime.

Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.

Source: Best Practices in Quick Changeover PowerPoint Slides: Lean Quick Changeover SMED PowerPoint (PPTX) Presentation, Nishil Josh


$29.00

Add to Cart
  

ABOUT THE AUTHOR

Author: Nishil Josh
Additional documents from author: 23

Business Excellence Professional with more than 20 years of experience in Manufacturing Operations, Quality Assurance & Improvement and Resource Management across diverse industry verticals. Expertise in managing production activities, streamlining processes / procedures to facilitate smooth production process & enhance productivity.

Ask the Author a Question

Must be logged in

Did you know?
The average daily rate of a McKinsey consultant is $6,625 (not including expenses). The average price of a Flevy document is $65.
Bundle and save! You can save up to % with bundles!

View bundle(s)




Trusted by over 10,000+ Client Organizations
Since 2012, we have provided best practices to over 10,000 businesses and organizations of all sizes, from startups and small businesses to the Fortune 100, in over 130 countries.
AT&T GE Cisco Intel IBM Coke Dell Toyota HP Nike Samsung Microsoft Astrazeneca JP Morgan KPMG Walgreens Walmart 3M Kaiser Oracle SAP Google E&Y Volvo Bosch Merck Fedex Shell Amgen Eli Lilly Roche AIG Abbott Amazon PwC T-Mobile Broadcom Bayer Pearson Titleist ConEd Pfizer NTT Data Schwab




Read Customer Testimonials




Save with Bundles

This document is available as part of the following discounted bundle(s):

Save %!
Lean Six Sigma Problem Solving Tools

This bundle contains 8 total documents. See all the documents to the right.

$50.00


Add Bundle & Save


Your Recently Viewed Documents

Customers Also Bought These Documents


Customers Also Like These Documents

Related Management Topics


Quick Changeover Standard Work Takt Time Just in Time PowerPoint Diagrams Compilation Workshops Lean Game Organizational Silos Kanban Consulting Frameworks Total Productive Maintenance Supply Chain Analysis Sales Deck Lean Six Sigma Black Belt

Receive our FREE presentation on Operational Excellence

This 50-slide presentation provides a high-level introduction to the 4 Building Blocks of Operational Excellence. Achieving OpEx requires the implementation of a Business Execution System that integrates these 4 building blocks.