RFQ and BOM Pricing Control Tower is an editable Excel control architecture focused specifically on request-for-quotation inputs, bill-of-material costs, supplier pricing, margin exposure, and approval-controlled commercial decisions. It is designed for finance and operations teams that need transparent calculations, disciplined ownership, and objective evidence rather than disconnected status updates.
The workbook receives RFQ, BOM, supplier, and margin inputs through designated input areas. Its calculation and control layers organise those records into traceable schedules without requiring users to re-key calculated outputs. Product-specific mappings, assumptions, thresholds, owners, and reporting periods remain visible so reviewers can identify the cause of each result.
The principal outputs cover controlled cost build-ups, margin analysis, and quotation decisions. Exception records identify the affected item, responsible owner, evidence state, timing, materiality, and resolution path. Integrity checks expose incomplete populations, inconsistent mappings, unsupported conclusions, and unresolved control states before management relies on the executive view.
Implementation begins by reviewing the workbook instructions, scope, and editable fields. The operating team then loads the applicable source population, confirms mappings and assumptions, assigns preparer and reviewer responsibilities, and investigates failed checks. Reported results should be accepted only after source completeness and exception status have been reviewed.
The model is suitable for controllers, finance managers, accountants, analysts, transformation teams, and advisers working within the stated product scope. Labels, periods, owners, thresholds, and organisational references can be adapted while preserving the control architecture. The workbook does not replace professional judgment, statutory advice, or approved accounting policy.
The canonical package provides the product-specific workbook together with the guides identified in its release archive. Every material output is intended to remain connected to a source record, formula, control step, or documented exception. This structure allows management to distinguish supported completion from assertion and to direct review effort toward the specific conditions that remain unresolved.
For this product, governance should retain a dated source population, named control owner, documented review result, and explicit record of every unresolved exception before executive reliance.
Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.
Source: Best Practices in Procurement Strategy Excel: RFQ and BOM Pricing Control Tower Excel (XLSX) Spreadsheet, Luke A.
|
Receive our FREE presentation on Operational Excellence
This 50-slide presentation provides a high-level introduction to the 4 Building Blocks of Operational Excellence. Achieving OpEx requires the implementation of a Business Execution System that integrates these 4 building blocks. |