Mining Project Finance Model: Reserve Tail, DSCR & AISC   Excel template (XLSX)
$79.00

Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Log in to unlock full preview.
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Mining Project Finance Model: Reserve Tail, DSCR & AISC (Excel template (XLSX)) Preview Image
Arrow   Click main image to view in full screen. Unlock all 9 preview images:   Login Register

Mining Project Finance Model: Reserve Tail, DSCR & AISC – Excel XLSX

Excel (XLSX) + supplemental PDF

$79.00
A mine is a depleting asset: the reserve caps production, the reserve tail covenant caps the tenor, and the debt is the lesser of DSCR capacity and the gearing cap - all computed, none assumed.
Add to Cart
  


Immediate download
Fully editable Excel
Free lifetime updates

BENEFITS OF THIS DOWNLOADABLE EXCEL DOCUMENT

  1. The orebody is the binding constraint: ore treated is the lesser of mill capacity and the reserve still standing, and cumulative tonnes are tested against the mineable reserve.
  2. The tenor is an output, capped by the reserve tail covenant computed at every candidate maturity - the test mining lenders actually apply and no template models.
  3. Nineteen integrity checks, eight of which no model with a typed-in production schedule can run, including the metal balance and units-of-production depreciation.

FINANCIAL MODELING EXCEL DESCRIPTION

Mining Project Finance Model: Reserve Tail, DSCR & AISC is an Excel template (XLSX) with a supplemental PDF document available for immediate download upon purchase.

Almost every mining model on the market is a discounted cash flow or a three-statement projection with a production schedule typed into a row. Both answer the investor's question – is the return above the cost of capital – and neither answers the lender's. A mine is not an annuity. It is a finite quantity of metal in the ground, and the loan has to be repaid while some of it is still there.

This workbook is built the other way round. Ore treated in any year is the lesser of mill capacity and the reserve still standing; cumulative tonnes are tested against the mineable reserve on the Checks tab; and when the pit is exhausted the mine stops rather than running on to the end of the model horizon. In the worked example a 132 Mt reserve through an 8 Mtpa mill gives sixteen full years and a seventeenth at four million tonnes, and then nothing.

THE TENOR IS AN OUTPUT

Mining lenders do not finance to the last tonne, and the test they apply is the reserve tail ratio: reserves remaining at final maturity divided by reserves depleted over the loan life, against a covenant of typically a quarter to a third. This model computes that ratio for every candidate maturity, year by year, and caps the facility at the longest tenor that clears. The sponsor in the worked example asks for fourteen years; the ratio is 0.375 at year twelve and 0.269 at year thirteen, so against a 0.30 covenant the answer is twelve – and the Dashboard says so in words.

THE QUANTUM IS AN OUTPUT TOO

A lender runs two tests and lends the lesser: what the cash flow services at a target cover ratio, and what the asset supports as a share of cost. The DSCR capacity is computed in closed form – the present value of CFADS over the tenor divided by the target ratio, one division, no goal seek and no solver, with the year-by-year workings on the same tab – and set beside the gearing cap on capitalised project cost. Here the gearing cap binds: the cash flow would have carried 1.49 billion and the facility is 893 million, which is exactly what a sponsor needs to see before negotiating terms.

REVENUE BUILT FROM METAL, NOT FROM AN ASSUMPTION

Contained metal is ore times head grade; recovery splits it between concentrate and tailings, and the Checks tab tests that the three tie in every single year. Concentrate tonnes follow from the concentrate grade, the smelter pays for a share of the contained metal, treatment and refining charges come off, the by-product credit goes on, and the royalty is charged on net smelter return. Mining cost is charged on total material moved – ore plus waste at the strip ratio – and processing on ore treated. Out of the same chain come C1 cash cost and all-in sustaining cost, the two numbers every mining analyst quotes.

NO CIRCULAR REFERENCES

Thirty monthly construction columns capitalise the arrangement fee, the commitment fee and the interest during construction month by month. Because interest is charged on the balance at the start of each month, the ledger resolves left to right – no cell depends on itself and iterative calculation stays switched off. The sculpting recursion is removed the same way, algebraically rather than by iteration.

TAX AND CLOSURE THE WAY A MINE ACTUALLY WORKS

Depreciation is units of production – capitalised cost written off in proportion to the tonnes treated – with the interest deduction and loss carry-forward, and a check confirms it ties to the share of the reserve mined. The closure provision is funded into a trust year by year, earns a return, and pays the rehabilitation bill in the year after the last ore is treated; a shortfall would be a cash call on the sponsor and a surplus is released.

NINETEEN INTEGRITY CHECKS

Every one must read PASS before you quote a number. Eight of them exist only because this model treats the mine as a depleting orebody: the reserve is never exceeded, the mill is never over-fed, the metal balances, the material moved ties to the strip ratio, the reserve tail clears the covenant, the trust funds the closure cost, and the depreciation matches the tonnes. A model with a typed-in production schedule cannot run them, because it never computes the quantities they test.

Twelve tabs: Read Me, Dashboard, Assumptions, Construction & Funding, Mine Plan & Reserve, Processing & Metal, Revenue & Costs, Debt Sizing, Debt Schedule, Cash Flow, Returns, Checks. Live formulas throughout. No macros, no add-ins, no external links, no locked cells and no passwords. Two exact one-way sensitivity tables – metal price and head grade – each a full twenty-two year recalculation with the workings on the page. An eleven-page PDF guide covers the method, the three inputs people get wrong, and the limitations stated plainly.

Building this from scratch takes a competent financial modeller two to four days.

Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.

Source: Best Practices in Financial Modeling, Mining Industry Excel: Mining Project Finance Model: Reserve Tail, DSCR & AISC Excel (XLSX) Spreadsheet, Balancewright


$79.00
A mine is a depleting asset: the reserve caps production, the reserve tail covenant caps the tenor, and the debt is the lesser of DSCR capacity and the gearing cap - all computed, none assumed.
Add to Cart
  

ABOUT THE AUTHOR

Author image
Author: Balancewright
Additional documents from author: 19

Balancewright builds working financial models for subscription and recurring-revenue businesses -- cohort retention, revenue movement, unit economics, cash flow and scenario forecasting.

Every model is formula-driven end to end. No locked cells, no passwords, no macros and no external links, so any calculation can be inspected, adapted and audited. Each file ships with a visible ... [read more]

Ask the Author a Question

You must be logged in to contact the author.

Click here to log in Click here register

Did you know?
The average daily rate of a McKinsey consultant is $6,625 (not including expenses). The average price of a Flevy document is $65.
Bundle and save!

Save up to % with Bundles!




Trusted by over 10,000+ Client Organizations
Since 2012, we have provided business templates to over 10,000 businesses and organizations of all sizes, from startups and small businesses to the Fortune 100, in over 130 countries.
AT&T GE Cisco Intel IBM Coke Dell Toyota HP Nike Samsung Microsoft Astrazeneca JP Morgan KPMG Walgreens Walmart 3M Kaiser Oracle SAP Google E&Y Volvo Bosch Merck Fedex Shell Amgen Eli Lilly Roche AIG Abbott Amazon PwC T-Mobile Broadcom Bayer Pearson Titleist ConEd Pfizer NTT Data Schwab





Read Customer Testimonials

 
"If you are looking for great resources to save time with your business presentations, Flevy is truly a value-added resource. Flevy has done all the work for you and we will continue to utilize Flevy as a source to extract up-to-date information and data for our virtual and onsite presentations!"

– Debbi Saffo, President at The NiKhar Group
 
"Flevy is our 'go to' resource for management material, at an affordable cost. The Flevy library is comprehensive and the content deep, and typically provides a great foundation for us to further develop and tailor our own service offer."

– Chris McCann, Founder at Resilient.World
 
"As an Independent Management Consultant, I find Flevy to add great value as a source of best practices, templates and information on new trends. Flevy has matured and the quality and quantity of the library is excellent. Lastly the price charged is reasonable, creating a win-win value for "

– Jim Schoen, Principal at FRC Group
 
"As a consultant requiring up to date and professional material that will be of value and use to my clients, I find Flevy a very reliable resource.

The variety and quality of material available through Flevy offers a very useful and commanding source for information. Using Flevy saves me time, enhances my expertise and ends up being a good decision."

– Dennis Gershowitz, Principal at DG Associates
 
"Last Sunday morning, I was diligently working on an important presentation for a client and found myself in need of additional content and suitable templates for various types of graphics. Flevy.com proved to be a treasure trove for both content and design at a reasonable price, considering the time I "

– M. E., Chief Commercial Officer, International Logistics Service Provider
 
"One of the great discoveries that I have made for my business is the Flevy library of training materials.

As a Lean Transformation Expert, I am always making presentations to clients on a variety of topics: Training, Transformation, Total Productive Maintenance, Culture, Coaching, Tools, Leadership Behavior, etc. Flevy "

– Ed Kemmerling, Senior Lean Transformation Expert at PMG
 
"The wide selection of frameworks is very useful to me as an independent consultant. In fact, it rivals what I had at my disposal at Big 4 Consulting firms in terms of efficacy and organization."

– Julia T., Consulting Firm Owner (Former Manager at Deloitte and Capgemini)
 
"As a consulting firm, we had been creating subject matter training materials for our people and found the excellent materials on Flevy, which saved us 100's of hours of re-creating what already exists on the Flevy materials we purchased."

– Michael Evans, Managing Director at Newport LLC




Save with Bundles

This document is available as part of the following discounted bundle(s):

Save %!
Project Finance Suite: PPP, Mining, Data Center & Solar

This bundle contains 4 total documents. See all the documents to the right.

$149.00


Add Bundle & Save



Customers Also Like These Documents

Explore Templates on Related Management Topics



Your Recently Viewed Documents
Download our FREE Strategy & Transformation Framework Templates

Download our free compilation of 50+ Strategy & Transformation slides and templates. Frameworks include McKinsey 7-S Strategy Model, Balanced Scorecard, Disruptive Innovation, BCG Experience Curve, and many more.