Data Center Project Finance Model: PUE, Power & DSCR Debt   Excel template (XLSX)
$79.00

Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Log in to unlock full preview.
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Data Center Project Finance Model: PUE, Power & DSCR Debt (Excel template (XLSX)) Preview Image
Arrow   Click main image to view in full screen. Unlock all 9 preview images:   Login Register

Data Center Project Finance Model: PUE, Power & DSCR Debt – Excel XLSX

Excel (XLSX) + supplemental PDF

$79.00
Power-constrained capacity, debt sized as an output, and 14 integrity checks: a data centre project finance model that treats the asset as megawatts rather than square feet.
Add to Cart
  


Immediate download
Fully editable Excel
Free lifetime updates

BENEFITS OF THIS DOWNLOADABLE EXCEL DOCUMENT

  1. Grid connection divided by design PUE gives the IT load you can actually sell - a hard ceiling the contract book and the facility load are tested against on every one of the twenty operating years.
  2. Debt is an output, not an input: DSCR capacity computed in closed form next to the loan-to-value cap, the lesser of the two drawn, and the binding constraint named in words.
  3. Fourteen integrity checks, four of which no floor-area model can run: the power balance, headroom against the grid connection, the capacity ceiling and the contract book bridge.

FINANCIAL MODELING EXCEL DESCRIPTION

Data Center Project Finance Model: PUE, Power & DSCR Debt is an Excel template (XLSX) with a supplemental PDF document available for immediate download upon purchase.

Almost every data centre model in circulation is a real estate model with the words "data centre" on the cover. It takes square feet, applies a rent, escalates it, subtracts an operating cost ratio and capitalises the result. That works for an office block. It does not work here, because this asset is not constrained by floor area. It is constrained by the megawatts the utility has agreed to deliver.

This workbook runs the chain in the direction the physics runs it. The grid connection divided by design PUE gives the IT load you can actually sell – cooling, distribution and losses take the difference – and that figure is a hard ceiling no lease-up plan can breach. Contracted IT load times the average customer draw gives the load drawn; that times PUE gives facility load; facility load against the connection gives headroom. The Checks tab tests, on every one of the twenty operating years, that the headroom is not negative and that the power balance reconciles exactly. Revenue then follows from the same quantities rather than from an unrelated rent roll: rent on committed IT load, metered energy recharged at cost plus a margin, and cross-connects per megawatt contracted.

Twenty-four monthly construction columns take the capital spend through an S-curve you control, fund it at your target gearing, and capitalise the arrangement fee, the commitment fee and the interest during construction month by month. Because interest is charged on the balance at the start of each month, the ledger resolves left to right – no cell depends on itself, and iterative calculation stays switched off.

Debt is an output here, not an input. A lender runs two tests and lends the lesser of them: what the cash flow services at a target cover ratio, and what the asset supports as a share of cost. The model computes the DSCR capacity in closed form – the present value of CFADS over the tenor divided by the target ratio, one division, no goal seek and no solver – computes the loan-to-value cap on capitalised project cost, draws the lesser of the two, and names the binding constraint in words on the Dashboard.

Between construction and a stabilised cash flow sits lease-up, and the financing has to survive it. The construction facility remains outstanding on an interest-only basis while the hall fills, with any interest the ramping cash flow cannot pay capitalised rather than assumed away. At the start of the stabilisation year the permanent facility is sized on the stabilised cash flow and drawn to repay it: a shortfall is an equity injection the model shows you, a surplus is released to the sponsor, and the Checks tab reconciles the refinancing to the cent.

The contract book is a bridge, not a typed-in row. Opening contracted load plus new contracts less churn equals the closing book, capped by the power ceiling, with the average book carrying revenue and the whole ramp shifted by an energisation delay you can set. That delay is the sensitivity that matters on a data centre in this market, and it is one of two exact one-way tables on the Returns tab: every case rebuilds the contract book, recomputes revenue, cost and tax, revalues the exit and re-solves the rate of return, with the workings on the same tab so you can audit them.

Fourteen integrity checks have to read PASS before any of it is worth quoting. Four of them exist only because this model treats the asset as a power business: the power balance reconciles every year, facility load never exceeds the grid connection, the contract book never exceeds the capacity ceiling, and the book bridge ties year by year. A model built on floor area cannot run them, because it never computes the quantities they test.

Twelve tabs: Read Me, Dashboard, Assumptions, Construction & Funding, Power & Capacity, Contracted Capacity, Revenue & Costs, Debt Sizing, Debt Schedule, Cash Flow, Returns, Checks. Live formulas throughout. No macros, no add-ins, no external links, no locked cells and no passwords. A worked example is pre-loaded – a 34 MW connection at 1.35 PUE, 24 MW of IT capacity built, leased up over four years at $155 per kW per month – so every tab works the moment you open it. A nine-page PDF guide covers the method, the three inputs people get wrong, and the limitations stated plainly.

Building this from scratch takes a competent financial modeller two to four days.

Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.

Source: Best Practices in Financial Modeling, Data Center Excel: Data Center Project Finance Model: PUE, Power & DSCR Debt Excel (XLSX) Spreadsheet, Paweł Dudek, Balancewright


$79.00
Power-constrained capacity, debt sized as an output, and 14 integrity checks: a data centre project finance model that treats the asset as megawatts rather than square feet.
Add to Cart
  

ABOUT THE AUTHOR

Author image
Additional documents from author: 33

Balancewright is Paweł Dudek. The catalogue covers project finance, fund and waterfall structures, corporate three-statement forecasting, working capital, valuation and FP&A -- built as working models rather than formatted templates.

Every model is formula-driven end to end. No locked cells, no passwords, no macros and no external links, so any calculation can be inspected, adapted and ... [read more]

Ask the Author a Question

You must be logged in to contact the author.

Click here to log in Click here register

Did you know?
The average daily rate of a McKinsey consultant is $6,625 (not including expenses). The average price of a Flevy document is $65.
Bundle and save!

Save up to % with Bundles!




Trusted by over 10,000+ Client Organizations
Since 2012, we have provided business templates to over 10,000 businesses and organizations of all sizes, from startups and small businesses to the Fortune 100, in over 130 countries.
AT&T GE Cisco Intel IBM Coke Dell Toyota HP Nike Samsung Microsoft Astrazeneca JP Morgan KPMG Walgreens Walmart 3M Kaiser Oracle SAP Google E&Y Volvo Bosch Merck Fedex Shell Amgen Eli Lilly Roche AIG Abbott Amazon PwC T-Mobile Broadcom Bayer Pearson Titleist ConEd Pfizer NTT Data Schwab





Read Customer Testimonials

 
"I have used FlevyPro for several business applications. It is a great complement to working with expensive consultants. The quality and effectiveness of the tools are of the highest standards."

– Moritz Bernhoerster, Global Sourcing Director at Fortune 500
 
"Flevy.com has proven to be an invaluable resource library to our Independent Management Consultancy, supporting and enabling us to better serve our enterprise clients.

The value derived from our [FlevyPro] subscription in terms of the business it has helped to gain far exceeds the investment made, making a subscription a no-brainer for any growing consultancy – or in-house strategy team."

– Dean Carlton, Chief Transformation Officer, Global Village Transformations Pty Ltd.
 
"[Flevy] produces some great work that has been/continues to be of immense help not only to myself, but as I seek to provide professional services to my clients, it gives me a large "tool box" of resources that are critical to provide them with the quality of service and outcomes they are expecting."

– Royston Knowles, Executive with 50+ Years of Board Level Experience
 
"As a consultant requiring up to date and professional material that will be of value and use to my clients, I find Flevy a very reliable resource.

The variety and quality of material available through Flevy offers a very useful and commanding source for information. Using Flevy saves me time, enhances my expertise and ends up being a good decision."

– Dennis Gershowitz, Principal at DG Associates
 
"The wide selection of frameworks is very useful to me as an independent consultant. In fact, it rivals what I had at my disposal at Big 4 Consulting firms in terms of efficacy and organization."

– Julia T., Consulting Firm Owner (Former Manager at Deloitte and Capgemini)
 
"Flevy is now a part of my business routine. I visit Flevy at least 3 times each month.

Flevy has become my preferred learning source, because what it provides is practical, current, and useful in this era where the business world is being rewritten.

In today's environment where there are so "

– Omar Hernán Montes Parra, CEO at Quantum SFE
 
"Last Sunday morning, I was diligently working on an important presentation for a client and found myself in need of additional content and suitable templates for various types of graphics. Flevy.com proved to be a treasure trove for both content and design at a reasonable price, considering the time I "

– M. E., Chief Commercial Officer, International Logistics Service Provider
 
"I have used Flevy services for a number of years and have never, ever been disappointed. As a matter of fact, David and his team continue, time after time, to impress me with their willingness to assist and in the real sense of the word. I have concluded in fact "

– Roberto Pelliccia, Senior Executive in International Hospitality




Save with Bundles

This document is available as part of the following discounted bundle(s):



Customers Also Like These Documents

Explore Templates on Related Management Topics



Your Recently Viewed Documents