Estimation of Capital Costs of Geothermal Power Projects   32-page PDF document
$500.00

Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Flevy is the marketplace for business best practices.
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Arrow   Click main image to view in full screen.

Estimation of Capital Costs of Geothermal Power Projects (PDF)

PDF document 32 Pages

$500.00
Engineering and Financial Analysis Expert
Add to Cart
  


Immediate download
Editable with PDF editor
Free lifetime updates

BENEFITS OF THIS PDF DOCUMENT

  1. Estimates level of details are prepared for a variety of strategic business planning purposes.
  2. De-risk investments through scenario-based profitability analysis.
  3. Win the competition in Tender / Bidding for IPP or EPC Works.

RENEWABLE ENERGY PDF DESCRIPTION

This product (Estimation of Capital Costs of Geothermal Power Projects) is a 32-page PDF document, which you can download immediately upon purchase.

Estimation of EPC and Investment Costs of Geothermal Power Projects (from 2.5 MW to 165 MW), 2025 Market Based Price.

The estimates are based on the FEL-1 level of detail, which we call Concept Screening or "Budgetary Cost Estimate". This estimate meets the Class 5 Estimate according to the AACE International Classification Standard, or ANSI Z94.0 Standard.

Generally, Class 5 Estimates level of details are prepared for a variety of strategic business planning purposes, for example but not limited to market studies, early stage project feasibility assessments, evaluation of business development opportunities, project selection, project site selection studies, evaluation of resource requirements and budgeting, basis for project development plan and capital budgeting, long-term capital planning, etc.

The contents of the report are as follows:

1. Estimate Class
1.1 Introduction
1.2 Capacity Factored Estimate
1.3 Cost Estimate Classification
1.3.1 Matrix of The Five Estimate Classes
1.3.2 Comparison of Cost Estimate Classification Practices
1.3.3 Characteristics of Estimate Classes

2. Engineering, Procurement and Construction (EPC) and Investment Cost Estimate
2.1 Basis of Estimate
2.1.1 The Selected Technologies for Basis of Estimate
2.1.2 Capital Cost Components
2.1.3 Estimate Class and Assumptions
2.2 Estimate Inputs Checklist
2.3 Capital Cost Estimate Summary
2.3.1 Geothermal Steam Flash Technology EPC and Investment Costs Estimate
2.3.2 Geothermal Combined Cycle Technology EPC and Investment Costs Estimate
2.4 Forward Escalation

3. Basic Flow Diagram
3.1 Flash Steam Geothermal Power Plant Basic Flow Diagram
3.2 Binary Geothermal Power Plant Basic Flow Diagram
3.3 Combined Cycle Geothermal Power Plant Basic Flow Diagram

4. EPC Scope of Works and The Associated Liquidated Damages

5. Referenced Documents

List of Table
Table 1 1: Cost Estimate Classification
Table 1 2: Comparison of Cost Estimate Classification Practices
Table 1 3: Characteristics of Estimate Classes
Table 2 1: Estimate Inputs Checklist
Table 2 2: EPC and Investment Cost Estimate (2.5 MW, 5 MW, 11 MW, 15 MW)
Table 2 3: EPC and Investment Cost Estimate (20 MW, 30 MW, 40 MW, 55 MW, 60 MW)
Table 2 4: EPC and Investment Cost Estimate (65 MW, 70 MW, 80 MW, 110 MW, 134 MW)
Table 2 5: EPC and Investment Cost Estimate (165 MW, 110 MW, 100 MW, 90 MW)
Table 2 6: EPC and Investment Cost Estimate (80 MW, 55 MW, 50 MW, 40 MW)
Table 2 7: EPC and Investment Cost Estimate (30 MW, 25 MW, 20 MW, 15 MW, 10 MW)
Table 5 1: Referenced Documents

List of Figure
Figure 3 1: Basic Flow Diagram of Single-Flash Geothermal Power Plant
Figure 3 2: Basic Flow Diagram of Double-Flash Geothermal Power Plant
Figure 3 3: Basic Flow Diagram of Binary Geothermal Power Plant
Figure 3 4: Basic Flow Diagram of Combined Cycle Geothermal Power Plant
Figure 4 1: Schematics Diagram of EPC Scope of Works

Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.

Source: Best Practices in Renewable Energy PDF: Estimation of Capital Costs of Geothermal Power Projects PDF (PDF) Document, Financial Engineering Consulting


$500.00
Engineering and Financial Analysis Expert
Add to Cart
  

ABOUT THE AUTHOR

Author image
Additional documents from author: 4

Should you ever require additional business development and engineering resources, whether to bridge internal capacity gaps, accelerate project development planning, or enhance the quality of technical documentation, please know that we are readily available to assist.

Services Delivery Approaches:

The proposed Services Delivery Approaches included, but not limited to the following ... [read more]

Ask the Author a Question

You must be logged in to contact the author.

Click here to log in Click here register

Did you know?
The average daily rate of a McKinsey consultant is $6,625 (not including expenses). The average price of a Flevy document is $65.




Trusted by over 10,000+ Client Organizations
Since 2012, we have provided best practices to over 10,000 businesses and organizations of all sizes, from startups and small businesses to the Fortune 100, in over 130 countries.
AT&T GE Cisco Intel IBM Coke Dell Toyota HP Nike Samsung Microsoft Astrazeneca JP Morgan KPMG Walgreens Walmart 3M Kaiser Oracle SAP Google E&Y Volvo Bosch Merck Fedex Shell Amgen Eli Lilly Roche AIG Abbott Amazon PwC T-Mobile Broadcom Bayer Pearson Titleist ConEd Pfizer NTT Data Schwab




Read Customer Testimonials

 
"As a niche strategic consulting firm, Flevy and FlevyPro frameworks and documents are an on-going reference to help us structure our findings and recommendations to our clients as well as improve their clarity, strength, and visual power. For us, it is an invaluable resource to increase our impact and value."

– David Coloma, Consulting Area Manager at Cynertia Consulting
 
"As a young consulting firm, requests for input from clients vary and it's sometimes impossible to provide expert solutions across a broad spectrum of requirements. That was before I discovered Flevy.com.

Through subscription to this invaluable site of a plethora of topics that are key and crucial to consulting, I "

– Nishi Singh, Strategist and MD at NSP Consultants
 
"I have used FlevyPro for several business applications. It is a great complement to working with expensive consultants. The quality and effectiveness of the tools are of the highest standards."

– Moritz Bernhoerster, Global Sourcing Director at Fortune 500
 
"One of the great discoveries that I have made for my business is the Flevy library of training materials.

As a Lean Transformation Expert, I am always making presentations to clients on a variety of topics: Training, Transformation, Total Productive Maintenance, Culture, Coaching, Tools, Leadership Behavior, etc. Flevy "

– Ed Kemmerling, Senior Lean Transformation Expert at PMG
 
"Last Sunday morning, I was diligently working on an important presentation for a client and found myself in need of additional content and suitable templates for various types of graphics. Flevy.com proved to be a treasure trove for both content and design at a reasonable price, considering the time I "

– M. E., Chief Commercial Officer, International Logistics Service Provider
 
"I have used Flevy services for a number of years and have never, ever been disappointed. As a matter of fact, David and his team continue, time after time, to impress me with their willingness to assist and in the real sense of the word. I have concluded in fact "

– Roberto Pelliccia, Senior Executive in International Hospitality
 
"Flevy.com has proven to be an invaluable resource library to our Independent Management Consultancy, supporting and enabling us to better serve our enterprise clients.

The value derived from our [FlevyPro] subscription in terms of the business it has helped to gain far exceeds the investment made, making a subscription a no-brainer for any growing consultancy – or in-house strategy team."

– Dean Carlton, Chief Transformation Officer, Global Village Transformations Pty Ltd.
 
"As a consultant requiring up to date and professional material that will be of value and use to my clients, I find Flevy a very reliable resource.

The variety and quality of material available through Flevy offers a very useful and commanding source for information. Using Flevy saves me time, enhances my expertise and ends up being a good decision."

– Dennis Gershowitz, Principal at DG Associates


Your Recently Viewed Documents


Customers Also Like These Documents

Related Management Topics


Renewable Energy Integrated Financial Model Energy Industry Value Chain Analysis

Download our FREE Strategy & Transformation Framework Templates

Download our free compilation of 50+ Strategy & Transformation slides and templates. Frameworks include McKinsey 7-S, Balanced Scorecard, Disruptive Innovation, BCG Curve, and many more.