Estimation of Capital Costs of Geothermal Power Projects   32-page PDF document
$100.00

Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Flevy is the marketplace for business best practices.
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Estimation of Capital Costs of Geothermal Power Projects (32-page PDF document) Preview Image
Arrow   Click main image to view in full screen.

Estimation of Capital Costs of Geothermal Power Projects (PDF)

PDF document 32 Pages

$100.00
Engineering and Financial Analysis Expert
Add to Cart
  


Immediate download
Editable with PDF editor
Free lifetime updates

BENEFITS OF THIS PDF DOCUMENT

  1. Estimates level of details are prepared for a variety of strategic business planning purposes.
  2. De-risk investments through scenario-based profitability analysis.
  3. Win the competition in Tender / Bidding for IPP or EPC Works.

RENEWABLE ENERGY PDF DESCRIPTION

Estimation of Capital Costs of Geothermal Power Projects is a 32-page PDF document available for immediate download upon purchase.

Estimation of EPC and Investment Costs of Geothermal Power Projects (from 2.5 MW to 165 MW), 2025 Market Based Price.

The estimates are based on the FEL-1 level of detail, which we call Concept Screening or "Budgetary Cost Estimate". This estimate meets the Class 5 Estimate according to the AACE International Classification Standard, or ANSI Z94.0 Standard.

Generally, Class 5 Estimates level of details are prepared for a variety of strategic business planning purposes, for example but not limited to market studies, early stage project feasibility assessments, evaluation of business development opportunities, project selection, project site selection studies, evaluation of resource requirements and budgeting, basis for project development plan and capital budgeting, long-term capital planning, etc.

The contents of the report are as follows:

1. Estimate Class
1.1 Introduction
1.2 Capacity Factored Estimate
1.3 Cost Estimate Classification
1.3.1 Matrix of The Five Estimate Classes
1.3.2 Comparison of Cost Estimate Classification Practices
1.3.3 Characteristics of Estimate Classes

2. Engineering, Procurement and Construction (EPC) and Investment Cost Estimate
2.1 Basis of Estimate
2.1.1 The Selected Technologies for Basis of Estimate
2.1.2 Capital Cost Components
2.1.3 Estimate Class and Assumptions
2.2 Estimate Inputs Checklist
2.3 Capital Cost Estimate Summary
2.3.1 Geothermal Steam Flash Technology EPC and Investment Costs Estimate
2.3.2 Geothermal Combined Cycle Technology EPC and Investment Costs Estimate
2.4 Forward Escalation

3. Basic Flow Diagram
3.1 Flash Steam Geothermal Power Plant Basic Flow Diagram
3.2 Binary Geothermal Power Plant Basic Flow Diagram
3.3 Combined Cycle Geothermal Power Plant Basic Flow Diagram

4. EPC Scope of Works and The Associated Liquidated Damages

5. Referenced Documents

List of Table
Table 1 1: Cost Estimate Classification
Table 1 2: Comparison of Cost Estimate Classification Practices
Table 1 3: Characteristics of Estimate Classes
Table 2 1: Estimate Inputs Checklist
Table 2 2: EPC and Investment Cost Estimate (2.5 MW, 5 MW, 11 MW, 15 MW)
Table 2 3: EPC and Investment Cost Estimate (20 MW, 30 MW, 40 MW, 55 MW, 60 MW)
Table 2 4: EPC and Investment Cost Estimate (65 MW, 70 MW, 80 MW, 110 MW, 134 MW)
Table 2 5: EPC and Investment Cost Estimate (165 MW, 110 MW, 100 MW, 90 MW)
Table 2 6: EPC and Investment Cost Estimate (80 MW, 55 MW, 50 MW, 40 MW)
Table 2 7: EPC and Investment Cost Estimate (30 MW, 25 MW, 20 MW, 15 MW, 10 MW)
Table 5 1: Referenced Documents

List of Figure
Figure 3 1: Basic Flow Diagram of Single-Flash Geothermal Power Plant
Figure 3 2: Basic Flow Diagram of Double-Flash Geothermal Power Plant
Figure 3 3: Basic Flow Diagram of Binary Geothermal Power Plant
Figure 3 4: Basic Flow Diagram of Combined Cycle Geothermal Power Plant
Figure 4 1: Schematics Diagram of EPC Scope of Works

Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.

Source: Best Practices in Renewable Energy PDF: Estimation of Capital Costs of Geothermal Power Projects PDF (PDF) Document, Financial Engineering Consulting


$100.00
Engineering and Financial Analysis Expert
Add to Cart
  

ABOUT THE AUTHOR

Author image
Additional documents from author: 8

Should you ever require additional business development and engineering resources, whether to bridge internal capacity gaps, accelerate project development planning, or enhance the quality of technical documentation, please know that we are readily available to assist.

Services Delivery Approaches:

The proposed Services Delivery Approaches included, but not limited to the following ... [read more]

Ask the Author a Question

You must be logged in to contact the author.

Click here to log in Click here register

Did you know?
The average daily rate of a McKinsey consultant is $6,625 (not including expenses). The average price of a Flevy document is $65.




Trusted by over 10,000+ Client Organizations
Since 2012, we have provided business templates to over 10,000 businesses and organizations of all sizes, from startups and small businesses to the Fortune 100, in over 130 countries.
AT&T GE Cisco Intel IBM Coke Dell Toyota HP Nike Samsung Microsoft Astrazeneca JP Morgan KPMG Walgreens Walmart 3M Kaiser Oracle SAP Google E&Y Volvo Bosch Merck Fedex Shell Amgen Eli Lilly Roche AIG Abbott Amazon PwC T-Mobile Broadcom Bayer Pearson Titleist ConEd Pfizer NTT Data Schwab





Read Customer Testimonials

 
"I have used FlevyPro for several business applications. It is a great complement to working with expensive consultants. The quality and effectiveness of the tools are of the highest standards."

– Moritz Bernhoerster, Global Sourcing Director at Fortune 500
 
"Flevy.com has proven to be an invaluable resource library to our Independent Management Consultancy, supporting and enabling us to better serve our enterprise clients.

The value derived from our [FlevyPro] subscription in terms of the business it has helped to gain far exceeds the investment made, making a subscription a no-brainer for any growing consultancy – or in-house strategy team."

– Dean Carlton, Chief Transformation Officer, Global Village Transformations Pty Ltd.
 
"I am extremely grateful for the proactiveness and eagerness to help and I would gladly recommend the Flevy team if you are looking for data and toolkits to help you work through business solutions."

– Trevor Booth, Partner, Fast Forward Consulting
 
"[Flevy] produces some great work that has been/continues to be of immense help not only to myself, but as I seek to provide professional services to my clients, it gives me a large "tool box" of resources that are critical to provide them with the quality of service and outcomes they are expecting."

– Royston Knowles, Executive with 50+ Years of Board Level Experience
 
"Flevy is now a part of my business routine. I visit Flevy at least 3 times each month.

Flevy has become my preferred learning source, because what it provides is practical, current, and useful in this era where the business world is being rewritten.

In today's environment where there are so "

– Omar Hernán Montes Parra, CEO at Quantum SFE
 
"Flevy is our 'go to' resource for management material, at an affordable cost. The Flevy library is comprehensive and the content deep, and typically provides a great foundation for us to further develop and tailor our own service offer."

– Chris McCann, Founder at Resilient.World
 
"My FlevyPro subscription provides me with the most popular frameworks and decks in demand in today’s market. They not only augment my existing consulting and coaching offerings and delivery, but also keep me abreast of the latest trends, inspire new products and service offerings for my practice, and educate me "

– Bill Branson, Founder at Strategic Business Architects
 
"FlevyPro provides business frameworks from many of the global giants in management consulting that allow you to provide best in class solutions for your clients."

– David Harris, Managing Director at Futures Strategy



Customers Also Like These Documents

Explore Related Management Topics



Your Recently Viewed Documents
Download our FREE Strategy & Transformation Framework Templates

Download our free compilation of 50+ Strategy & Transformation slides and templates. Frameworks include McKinsey 7-S, Balanced Scorecard, Disruptive Innovation, BCG Curve, and many more.