Estimation of EPC and Investment Costs of Geothermal Power Projects (from 2.5 MW to 165 MW), 2025 Market Based Price.
The estimates are based on the FEL-1 level of detail, which we call Concept Screening or "Budgetary Cost Estimate". This estimate meets the Class 5 Estimate according to the AACE International Classification Standard, or ANSI Z94.0 Standard.
Generally, Class 5 Estimates level of details are prepared for a variety of strategic business planning purposes, for example but not limited to market studies, early stage project feasibility assessments, evaluation of business development opportunities, project selection, project site selection studies, evaluation of resource requirements and budgeting, basis for project development plan and capital budgeting, long-term capital planning, etc.
The contents of the report are as follows:
1. Estimate Class
1.1 Introduction
1.2 Capacity Factored Estimate
1.3 Cost Estimate Classification
1.3.1 Matrix of The Five Estimate Classes
1.3.2 Comparison of Cost Estimate Classification Practices
1.3.3 Characteristics of Estimate Classes
2. Engineering, Procurement and Construction (EPC) and Investment Cost Estimate
2.1 Basis of Estimate
2.1.1 The Selected Technologies for Basis of Estimate
2.1.2 Capital Cost Components
2.1.3 Estimate Class and Assumptions
2.2 Estimate Inputs Checklist
2.3 Capital Cost Estimate Summary
2.3.1 Geothermal Steam Flash Technology EPC and Investment Costs Estimate
2.3.2 Geothermal Combined Cycle Technology EPC and Investment Costs Estimate
2.4 Forward Escalation
3. Basic Flow Diagram
3.1 Flash Steam Geothermal Power Plant Basic Flow Diagram
3.2 Binary Geothermal Power Plant Basic Flow Diagram
3.3 Combined Cycle Geothermal Power Plant Basic Flow Diagram
4. EPC Scope of Works and The Associated Liquidated Damages
5. Referenced Documents
List of Table
Table 1 1: Cost Estimate Classification
Table 1 2: Comparison of Cost Estimate Classification Practices
Table 1 3: Characteristics of Estimate Classes
Table 2 1: Estimate Inputs Checklist
Table 2 2: EPC and Investment Cost Estimate (2.5 MW, 5 MW, 11 MW, 15 MW)
Table 2 3: EPC and Investment Cost Estimate (20 MW, 30 MW, 40 MW, 55 MW, 60 MW)
Table 2 4: EPC and Investment Cost Estimate (65 MW, 70 MW, 80 MW, 110 MW, 134 MW)
Table 2 5: EPC and Investment Cost Estimate (165 MW, 110 MW, 100 MW, 90 MW)
Table 2 6: EPC and Investment Cost Estimate (80 MW, 55 MW, 50 MW, 40 MW)
Table 2 7: EPC and Investment Cost Estimate (30 MW, 25 MW, 20 MW, 15 MW, 10 MW)
Table 5 1: Referenced Documents
List of Figure
Figure 3 1: Basic Flow Diagram of Single-Flash Geothermal Power Plant
Figure 3 2: Basic Flow Diagram of Double-Flash Geothermal Power Plant
Figure 3 3: Basic Flow Diagram of Binary Geothermal Power Plant
Figure 3 4: Basic Flow Diagram of Combined Cycle Geothermal Power Plant
Figure 4 1: Schematics Diagram of EPC Scope of Works
Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.
Source: Best Practices in Renewable Energy PDF: Estimation of Capital Costs of Geothermal Power Projects PDF (PDF) Document, Financial Engineering Consulting
Renewable Energy Integrated Financial Model Energy Industry Value Chain Analysis
|
Download our FREE Strategy & Transformation Framework Templates
Download our free compilation of 50+ Strategy & Transformation slides and templates. Frameworks include McKinsey 7-S, Balanced Scorecard, Disruptive Innovation, BCG Curve, and many more. |