Sorry, this document is currently only available to FlevyPro subscribers.
You can join FlevyPro for only $39/month.
This deck presents a status update on the Lean implementation after 2 years at NZ King Salmon, a 400+ people SME organization specializing in the production of freshwater hatcheries, sea farms, and processing facilities.
Summary:
At 18 months post Lean launch, a reflection a game of three halves:
1. Got quite a few things right at the beginning
2. Lost track somewhat in the middle
3. Starting to make headway again
Got a question about this document? Email us at flevypro@flevy.com.
Source: Year Two of Lean at NZ King Salmon PowerPoint (PPT) Presentation Slide Deck, OpEx Academy NZ
Sorry, this document is currently only available to FlevyPro subscribers.
You can join FlevyPro for only $39/month.
Did you need more documents?
Consider a FlevyPro subscription from $39/month. View plans here.
|
Receive our FREE presentation on Operational Excellence
This 50-slide presentation provides a high-level introduction to the 4 Building Blocks of Operational Excellence. Achieving OpEx requires the implementation of a Business Execution System that integrates these 4 building blocks. |