Gage R&R worksheet is for calculating the Gage R&R Study by the Short Method.
The Sigma Level tool is a simple way to calculate Sigma Levels and ZBench. It provides three unique methods to calculate the Sigma Levels for your project.
1. SIGMA LEVEL CALCULATION IS BASED ON DEFECTS COUNT
2. SIGMA LEVEL CALCULATION BASED ON OPPORTUNITIES
3. ZBENCH CALCULATION BASED ON ATTRIBUTE DATA
Both worksheets are customizable and can be modified based on the organization's specific project needs.
Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.
Source: Best Practices in Gage R&R, Gage Repeatability and Reproducibility Excel: Lean & Six Sigma - Measure Bundle (Gage R&R, Sigma Level Calc) Excel (XLSX) Spreadsheet, QMaxima Inc. - Simplifying Excellence
MSA Measurement Systems Analysis Six Sigma Project Six Sigma Gage R&R Gage Repeatability and Reproducibility Excel Project Plan Project Planning Workbook Excel Project Management Lean Lean Management Lean Thinking Lean Management/Enterprise Lean Enterprise Return on Investment ROI Lean Six Sigma Green Belt Lean Six Sigma Black Belt QFD Quality Function Deployment
![]() |
Receive our FREE presentation on Operational Excellence
This 50-slide presentation provides a high-level introduction to the 4 Building Blocks of Operational Excellence. Achieving OpEx requires the implementation of a Business Execution System that integrates these 4 building blocks. |