Cloud migration programmes rarely fail because a workload cannot technically be lifted and moved. They fail because the organisation behind the migration was not ready before the timeline was set: application inventories are incomplete, dependency maps are missing, and governance structures get built only after the first wave has already slipped.
This Excel-based scoring model gives programme leadership a structured, weighted answer to that readiness question before commitments are made. It scores 30 assessment criteria across six weighted dimensions and rolls the result into a single Cloud Migration Readiness Score on a 1–5 scale, with automated RAG status (Ready / Caution / At Risk) calculated at both dimension and overall level. A built-in Vendor Yes/No toggle activates or deactivates a dedicated Vendor Management dimension and redistributes weighting automatically, so the same instrument produces a relevant readiness view whether the migration is delivered internally or through an external partner.
The workbook opens with an Instructions tab explaining the scoring method and the vendor toggle, followed by a Settings tab where dimension weights, vendor status, and vendor allocation percentage are configured. The Assessment tab carries all 30 criteria, covering application portfolio readiness, infrastructure and network readiness, team capability and capacity, data, security and compliance, governance and change management, and vendor management, each scored 1–5 with an evidence prompt and a recommended action attached. A Dashboard tab consolidates these into the overall weighted score, dimension-level RAG status, and a priority action list generated automatically for any dimension scoring below the readiness threshold.
The model is built for cloud programme and portfolio managers, CIOs and infrastructure leads building the investment case for leadership, PMO teams setting wave readiness gates, and management consultants or system integrators demonstrating client or programme readiness. Because milestones change the readiness picture, the assessment is designed to be re-run at each major stage, including wave planning, pilot completion, and wave 1 cutover, to track how the organisation's readiness position moves over the life of the programme.
Format: Excel (.xlsx), no macros or VBA. Works in Excel 2016+ and Google Sheets. Instructions included; no external dependencies.
Published by Viksya. Seller licence terms are included within the document and take precedence over platform defaults
Got a question about the product? Email us at support@flevy.com or ask the author directly by using the "Ask the Author a Question" form. If you cannot view the preview above this document description, go here to view the large preview instead.
Source: Best Practices in Cloud Excel: Cloud Migration Readiness Scoring Model Excel (XLSX) Spreadsheet, Viksya
|
Download our FREE Digital Transformation Templates
Download our free compilation of 50+ Digital Transformation slides and templates. DX concepts covered include Digital Leadership, Digital Maturity, Digital Value Chain, Customer Experience, Customer Journey, RPA, etc. |